ENGINEERING & EPC

Topside FEED for FPSO Tangkulo

16-module FPSO conversion, South Andaman Sea
Client: Bumi Armada / Mubadala Energy
Year: 2025
Read case study →

ENGINEERING & EPC

EPC for Vietnam Block B Gas Project

Condensate Stabilization Package
Client: McDermott / PTSC
Year: 2024
Read case study →

ENGINEERING & EPC

Alexandre de Gusmao FPSO, Mero-4

Seawater Injection, Produced Water Treatment & TEG
Client: National Oilwell Varco / SBM
Year: 2022
Read case study →

ENGINEERING & EPC

Almirante Tamandare FPSO, Buzios

Seawater Injection, Produced Water Treatment & TEG
Client: National Oilwell Varco / SBM
Year: 2021
Read case study →

ENGINEERING & EPC

Detailed Engineering, NELP Block KG-DWN-98/2 (Cluster II)

Multiple EPC process modules for a deepwater FPSO
Client: Shapoorji Pallonji Oil & Gas Pvt. Ltd.
Year: 2019
Read case study →

ENGINEERING & EPC

Offshore Condensate Mercury Removal Unit, NC3 Platform

HYDAC Technology / Sapura Borneo Offshore JV / PETRONAS
Client: Bumi Armada / Mubadala Energy
Year: 2018
Read case study →

ENGINEERING & EPC

ULSADO Diesel Hydrotreater FEED, Port Dickson Refinery

Ultra-Low-Sulphur Automotive Diesel Oil, EURO-5M
Client: UOP Malaysia / PETRON Malaysia
Year: 2018
Read case study →

ENGINEERING & EPC

PPL Separex CO₂ Removal Project

Membrane-based CO₂ removal, fast-track delivery
Client: UOP Malaysia
Year: 2018
Read case study →

ENGINEERING & EPC

IPC Malaysia, Bertam Field Engineering Service Contract

WHP & FPSO modification, multi-discipline
Client: IPC Malaysia (formerly Lundin Malaysia)
Year: 2015 - 2019
Read case study →

ENGINEERING & EPC

FEED for WHP, Bokor Phase 3 Re-development

Three unmanned wellhead platforms, FEED competition
Client: Muhibbah Engineering Sdn. Bhd. / PETRONAS
Year: 2015
Read case study →

ENGINEERING & EPC

SEP-iSYS™ Package for PETRONAS FLNG2 (Rotan Field)

900# high-pressure, three-train inlet facility
Client: JGC Corporation, Japan / PETRONAS
Year: 2014 - 2018
Read case study →

ENGINEERING & EPC

Tanjong Baram WHP Development

Unmanned minimum-facilities platform, 8.2 km tie-back
Client: 2H Offshore Engineering Sdn. Bhd. / EnQuest Malaysia
Year: 2014
Read case study →

ENGINEERING & EPC

Foroozan Field Development & Production Enhancement

New process platform (FZ-A), Persian Gulf
Client: SEHWA Co. Ltd, Korea / IOEC, Iran
Year: 2014
Read case study →

PATENTED TECHNOLOGY

SEP-iSYS™ LPPU, Mature Field Production

Low Pressure Production Unit · West Lutong & Angsi
Client: PETRONAS
Year: 2014 & 2016
Read case study →

PATENTED TECHNOLOGY

SEP-iSYS™ CSRS & GRS, Sand & Gas Recovery

Compact cyclonic sand removal & gas recovery
Client: PETRONAS
Year: 2016 - 2023
Read case study →

PATENTED TECHNOLOGY

SEP-iSYS™, Marginal & Stranded Field Processing

Slug handling, separation, EWT & crude stabilization
Client: TGT & D1 FPSO, Nautica Muar, MISC MaMPU1, Ophir FPSO
Year: 2011 & 2017
Read case study →

GREEN & DECARBONIZATION

Enhanced LP-CRS™, Condensate Recovery & Emission Reduction

NGL and condensate recovery from low-pressure sources
Client: MISC MaMPU1, Tamarind FPSO Intrepid, PETRONAS Erb West, Vestigo Tembikai
Year: 2014 & 2018
Read case study →

GREEN & DECARBONIZATION

VOC-RS™, Volatile Organic Compound Recovery

Recovering VOC emissions from production facilities
Client: Award-recognised technology (OTC Asia)
Year: Deployed
Read case study →

GREEN & DECARBONIZATION

VERDYGEN™, TurboChill™ + AlgaeBloom™ CCUS

Carbon capture & utilization for hard-to-abate industry
Client: NGLTech R&D (Pilot Plant, Kuchai Lama)
Year: Pilot (TRL 7 to 9)
Read case study →

GREEN & DECARBONIZATION

IsobaricGT™, High-Speed Gas Transfer

Isobaric CNG transfer for stranded & associated gas
Client: NGLTech / SEDC Energy (Sarawak deployment intent)
Year: Pilot
Read case study →

PATENTED TECHNOLOGY

SEP-iSYS™ LPPU, Mature Field Production

Low Pressure Production Unit · West Lutong & Angsi
Client: PETRONAS
Year: 2014 & 2016
Read case study →

PATENTED TECHNOLOGY

SEP-iSYS™ CSRS & GRS, Sand & Gas Recovery

Compact cyclonic sand removal & gas recovery
Client: PETRONAS
Year: 2016 - 2023
Read case study →

PATENTED TECHNOLOGY

SEP-iSYS™, Marginal & Stranded Field Processing

Slug handling, separation, EWT & crude stabilization
Client: TGT & D1 FPSO, Nautica Muar, MISC MaMPU1, Ophir FPSO
Year: 2011 & 2017
Read case study →

ENGINEERING & EPC

Topside FEED for FPSO Tangkulo

16-module FPSO conversion, South Andaman Sea
Client: Bumi Armada / Mubadala Energy
Year: 2025
Read case study →

ENGINEERING & EPC

EPC for Vietnam Block B Gas Project

Condensate Stabilization Package
Client: McDermott / PTSC
Year: 2024
Read case study →

ENGINEERING & EPC

Alexandre de Gusmao FPSO, Mero-4

Seawater Injection, Produced Water Treatment & TEG
Client: National Oilwell Varco / SBM
Year: 2022
Read case study →

ENGINEERING & EPC

Almirante Tamandare FPSO, Buzios

Seawater Injection, Produced Water Treatment & TEG
Client: National Oilwell Varco / SBM
Year: 2021
Read case study →

ENGINEERING & EPC

Detailed Engineering, NELP Block KG-DWN-98/2 (Cluster II)

Multiple EPC process modules for a deepwater FPSO
Client: Shapoorji Pallonji Oil & Gas Pvt. Ltd.
Year: 2019
Read case study →

ENGINEERING & EPC

Offshore Condensate Mercury Removal Unit, NC3 Platform

HYDAC Technology / Sapura Borneo Offshore JV / PETRONAS
Client: Bumi Armada / Mubadala Energy
Year: 2018
Read case study →

ENGINEERING & EPC

ULSADO Diesel Hydrotreater FEED, Port Dickson Refinery

Ultra-Low-Sulphur Automotive Diesel Oil, EURO-5M
Client: UOP Malaysia / PETRON Malaysia
Year: 2018
Read case study →

ENGINEERING & EPC

PPL Separex CO₂ Removal Project

Membrane-based CO₂ removal, fast-track delivery
Client: UOP Malaysia
Year: 2018
Read case study →

ENGINEERING & EPC

IPC Malaysia, Bertam Field Engineering Service Contract

WHP & FPSO modification, multi-discipline
Client: IPC Malaysia (formerly Lundin Malaysia)
Year: 2015 - 2019
Read case study →

ENGINEERING & EPC

FEED for WHP, Bokor Phase 3 Re-development

Three unmanned wellhead platforms, FEED competition
Client: Muhibbah Engineering Sdn. Bhd. / PETRONAS
Year: 2015
Read case study →

ENGINEERING & EPC

SEP-iSYS™ Package for PETRONAS FLNG2 (Rotan Field)

900# high-pressure, three-train inlet facility
Client: JGC Corporation, Japan / PETRONAS
Year: 2014 - 2018
Read case study →

GREEN & DECARBONIZATION

Enhanced LP-CRS™, Condensate Recovery & Emission Reduction

NGL and condensate recovery from low-pressure sources
Client: MISC MaMPU1, Tamarind FPSO Intrepid, PETRONAS Erb West, Vestigo Tembikai
Year: 2014 & 2018
Read case study →

GREEN & DECARBONIZATION

VOC-RS™, Volatile Organic Compound Recovery

Recovering VOC emissions from production facilities
Client: Award-recognised technology (OTC Asia)
Year: Deployed
Read case study →

GREEN & DECARBONIZATION

VERDYGEN™, TurboChill™ + AlgaeBloom™ CCUS

Carbon capture & utilization for hard-to-abate industry
Client: NGLTech R&D (Pilot Plant, Kuchai Lama)
Year: Pilot (TRL 7 to 9)
Read case study →

GREEN & DECARBONIZATION

IsobaricGT™, High-Speed Gas Transfer

Isobaric CNG transfer for stranded & associated gas
Client: NGLTech / SEDC Energy (Sarawak deployment intent)
Year: Pilot
Read case study →