Engineered solutions delivered across the global oil & gas value chain
From FEED and EPC for offshore mega-projects to patented technologies that revive mature fields and cut emissions, a selection of projects NGLTech has delivered worldwide.
RECOGNISED BY
- OTC Asia Award Winner: 2018, 2020 & 2024
- IChemE Oil & Gas Award 2018
- ADIPEC 2023 Finalist
- SME100 Fast Moving Company
- Pioneer Status & R&D Company
ENGINEERING & EPC
Topside FEED for FPSO Tangkulo
ENGINEERING & EPC
EPC for Vietnam Block B Gas Project
ENGINEERING & EPC
Alexandre de Gusmao FPSO, Mero-4
ENGINEERING & EPC
Almirante Tamandare FPSO, Buzios
ENGINEERING & EPC
Detailed Engineering, NELP Block KG-DWN-98/2 (Cluster II)
ENGINEERING & EPC
Offshore Condensate Mercury Removal Unit, NC3 Platform
ENGINEERING & EPC
ULSADO Diesel Hydrotreater FEED, Port Dickson Refinery
ENGINEERING & EPC
PPL Separex CO₂ Removal Project
ENGINEERING & EPC
IPC Malaysia, Bertam Field Engineering Service Contract
ENGINEERING & EPC
FEED for WHP, Bokor Phase 3 Re-development
ENGINEERING & EPC
SEP-iSYS™ Package for PETRONAS FLNG2 (Rotan Field)
ENGINEERING & EPC
Tanjong Baram WHP Development
ENGINEERING & EPC
Foroozan Field Development & Production Enhancement
PATENTED TECHNOLOGY
SEP-iSYS™ LPPU, Mature Field Production
PATENTED TECHNOLOGY
SEP-iSYS™ CSRS & GRS, Sand & Gas Recovery
PATENTED TECHNOLOGY
SEP-iSYS™, Marginal & Stranded Field Processing
GREEN & DECARBONIZATION
Enhanced LP-CRS™, Condensate Recovery & Emission Reduction
GREEN & DECARBONIZATION
VOC-RS™, Volatile Organic Compound Recovery
GREEN & DECARBONIZATION
VERDYGEN™, TurboChill™ + AlgaeBloom™ CCUS
GREEN & DECARBONIZATION
IsobaricGT™, High-Speed Gas Transfer
PATENTED TECHNOLOGY
SEP-iSYS™ LPPU, Mature Field Production
PATENTED TECHNOLOGY
SEP-iSYS™ CSRS & GRS, Sand & Gas Recovery
PATENTED TECHNOLOGY
SEP-iSYS™, Marginal & Stranded Field Processing
ENGINEERING & EPC
Topside FEED for FPSO Tangkulo
ENGINEERING & EPC
EPC for Vietnam Block B Gas Project
ENGINEERING & EPC
Alexandre de Gusmao FPSO, Mero-4
ENGINEERING & EPC
Almirante Tamandare FPSO, Buzios
ENGINEERING & EPC
Detailed Engineering, NELP Block KG-DWN-98/2 (Cluster II)
ENGINEERING & EPC
Offshore Condensate Mercury Removal Unit, NC3 Platform
ENGINEERING & EPC
ULSADO Diesel Hydrotreater FEED, Port Dickson Refinery
ENGINEERING & EPC
PPL Separex CO₂ Removal Project
ENGINEERING & EPC
IPC Malaysia, Bertam Field Engineering Service Contract
ENGINEERING & EPC
FEED for WHP, Bokor Phase 3 Re-development
ENGINEERING & EPC
SEP-iSYS™ Package for PETRONAS FLNG2 (Rotan Field)
GREEN & DECARBONIZATION
Enhanced LP-CRS™, Condensate Recovery & Emission Reduction
GREEN & DECARBONIZATION
VOC-RS™, Volatile Organic Compound Recovery
GREEN & DECARBONIZATION
VERDYGEN™, TurboChill™ + AlgaeBloom™ CCUS
GREEN & DECARBONIZATION
IsobaricGT™, High-Speed Gas Transfer
Engineering & EPC
Topside FEED for FPSO Tangkulo
THE CHALLENGE
Bumi Armada and Mubadala Energy needed a robust, execution-ready topside design to bring the Tangkulo FPSO into production in the South Andaman Sea, spanning sixteen distinct process modules that all had to integrate on a single converted hull.
THE NGLTECH SOLUTION
NGLTech delivered full multi-disciplinary FEED across all 16 process modules, coordinating process, mechanical, structural, piping, electrical and instrumentation scopes into one integrated topside design ready for detailed engineering and construction.
RESULTS & IMPACT
A complete, integrated FEED package for a 16-module topside that de-risks the downstream EPC phase and gives the operator a construction-ready basis of design for offshore oil & gas production.
TECHNOLOGIES &CAPABILITIES
FEED
FPSO Topside
Process
Structural
Piping
Engineering & EPC
EPC for Vietnam Block B Gas Project
THE CHALLENGE
The Vietnam Block B development required a reliable Condensate Stabilization Package delivered on a demanding consortium schedule, with the single-point accountability that only a full EPC scope can provide.
THE NGLTECH SOLUTION
Working under the McDermott and PTSC consortium, NGLTech took the Condensate Stabilization Package through complete Engineering, Procurement and Construction, owning design, vendor management, fabrication and delivery.
RESULTS & IMPACT
An EPC-delivered condensate stabilization package for one of Vietnam's landmark gas developments, strengthening NGLTech's track record as an EPC partner to tier-one international contractors.
TECHNOLOGIES &CAPABILITIES
FEED
Condensate Stabilization
Procurement
Construction
Engineering & EPC
Alexandre de Gusmao FPSO, Mero-4
THE CHALLENGE
The Mero-4 development in Brazil's pre-salt Santos Basin required a high-capacity water injection and produced-water treatment system durable enough for decades of continuous offshore service within a tightly constrained module envelope.
THE NGLTECH SOLUTION
NGLTech performed the detailed engineering design of a 200,000 BWPD water injection and produced-water treatment system, plus TEG package, packaged into a 39 m by 24 m by 22 m module weighing approximately 2,900 MT.
RESULTS & IMPACT
A detail-engineered 200,000 BWPD module rated for a 35-year design life, delivering the throughput and longevity demanded by a flagship pre-salt FPSO.
TECHNOLOGIES &CAPABILITIES
Detailed Engineering
Water Injection
Produced Water Treatment
TEG
Engineering & EPC
Almirante Tamandare FPSO, Buzios
THE CHALLENGE
Buzios, one of the world's largest deepwater fields, needed an exceptionally high-capacity water management system engineered to survive 35 years offshore without compromising the module's size and weight limits.
THE NGLTECH SOLUTION
NGLTech delivered the detailed engineering design of a 220,000 BWPD water injection and produced-water treatment system with TEG package, housed in a 39 m by 24 m by 22 m module weighing approximately 2,900 MT.
RESULTS & IMPACT
A 220,000 BWPD module engineered to a 35-year design life for one of the highest-output FPSOs in the pre-salt, reinforcing NGLTech's capability in large-scale water treatment topsides.
TECHNOLOGIES &CAPABILITIES
Detailed Engineering
Water Injection
Produced Water Treatment
TEG
Engineering & EPC
Detailed Engineering, NELP Block KG-DWN-98/2 (Cluster II)
THE CHALLENGE
The Cluster II development in India's deepwater KG Basin required detailed engineering for a broad slate of interconnected process modules, each critical to bringing the FPSO online as a single coordinated EPC.
THE NGLTECH SOLUTION
NGLTech carried out detailed engineering design for multiple EPC modules, including water treatment, gas dehydration, compression, flare systems, crude separation and associated utility packages.
RESULTS & IMPACT
A coordinated detailed-engineering package spanning the full process train of a deepwater FPSO, supporting one of India's key East-coast gas developments.
TECHNOLOGIES &CAPABILITIES
Detailed Engineering
Gas Dehydration
Compression
Crude Separation
Flare Systems
Engineering & EPC
Offshore Condensate Mercury Removal Unit, NC3 Platform
THE CHALLENGE
The NC3 platform needed a compact, offshore-hardened mercury removal unit that could protect downstream equipment while allowing practical six-month filter change-out intervals.
THE NGLTECH SOLUTION
NGLTech delivered the EPC of a 250 MT Mercury Removal Unit comprising three pre-filters and three fine filters (25 MT each), adapted from a proven QOC design to suit six-month change-out cycles.
RESULTS & IMPACT
A fully EPC-delivered 250 MT mercury removal package sized for low-maintenance offshore operation, protecting condensate quality and downstream assets.
TECHNOLOGIES &CAPABILITIES
EPC
Gas Dehydration
Filtration
Offshore Package
Engineering & EPC
ULSADO Diesel Hydrotreater FEED, Port Dickson Refinery
THE CHALLENGE
PETRON's Port Dickson refinery needed to bring automotive diesel to the EURO-5M standard, a step-change reduction in sulphur, while integrating new units into existing, operating refinery infrastructure.
THE NGLTECH SOLUTION
NGLTech delivered the FEED for a Diesel Hydrotreater (DHT) system reducing sulphur from 500 ppm to 10 ppm, including ISBL units (DHT, SWS, BSR) and OSBL modifications to tie into the existing refinery.
RESULTS & IMPACT
A FEED package enabling EURO-5M-compliant (10 ppm sulphur) diesel production, supporting cleaner fuels and regulatory compliance at an operating Malaysian refinery.
TECHNOLOGIES &CAPABILITIES
FEED
Diesel Hydrotreater
Refinery
Clean Fuels
EURO-5M
Engineering & EPC
PPL Separex CO₂ Removal Project
THE CHALLENGE
The PPL project called for a membrane-based CO₂ removal unit handling high-pressure, sour gas in exotic materials, engineered and delivered on an aggressive three-month schedule.
THE NGLTECH SOLUTION
NGLTech provided detailed engineering support for the Separex CO₂ removal unit, comprising pre-treatment and membrane skids designed for high-pressure sour service using exotic materials.
RESULTS & IMPACT
A detailed-engineering package delivered on a three-month fast-track, demonstrating NGLTech's ability to execute complex sour-gas processing scopes under tight timelines.
TECHNOLOGIES &CAPABILITIES
Detailed Engineering
CO₂ Removal
Membrane
Sour Gas
Engineering & EPC
IPC Malaysia, Bertam Field Engineering Service Contract
THE CHALLENGE
Bertam field operations required ongoing, wide-ranging engineering support to keep an FPSO and wellhead platform producing safely and efficiently across a multi-year contract.
THE NGLTECH SOLUTION
NGLTech provided multi-discipline engineering services for Bertam WHP and FPSO modification works, covering structural, safety, process, electrical and integrity studies, including vessel re-rating, SOL studies, SIL verification, corrosion assessments and flowline engineering.
RESULTS & IMPACT
Sustained safe and efficient production over a multi-year term through continuous engineering support, a long-run partnership across the full engineering discipline set.
TECHNOLOGIES &CAPABILITIES
Engineering Services
SIL Verification
Vessel Re-rating
Integrity
Brownfield
Engineering & EPC
FEED for WHP, Bokor Phase 3 Re-development
THE CHALLENGE
The Bokor Phase 3 re-development required minimum-facilities, unmanned wellhead platforms capable of high-rate production and high-pressure water-alternating-gas injection, with a 25-year design life, assessed through a competitive FEED.
THE NGLTECH SOLUTION
NGLTech designed three unmanned WHP platforms, two oil producers and one iWAG injector, rated up to 15,000 bpd & 7 MMscfd (oil) and 40,000 bpd & 20 MMscfd (injection), engineered for high-pressure injection and a 25-year design life.
RESULTS & IMPACT
A competitive FEED for three unmanned platforms meeting demanding production and injection duties, showcasing NGLTech's minimum-facilities platform design capability.
TECHNOLOGIES &CAPABILITIES
FEED
Wellhead Platform
iWAG Injection
Integrity
Minimum Facilities
Engineering & EPC
SEP-iSYS™ Package for PETRONAS FLNG2 (Rotan Field)
THE CHALLENGE
PETRONAS FLNG2 in the deepwater Rotan field required a high-pressure inlet facility for sour service, engineered to run 20 years offshore without dry docking, a duty demanding exotic materials and exceptional reliability.
THE NGLTECH SOLUTION
NGLTech supplied a high-pressure, three-train Inlet Facility Processing System (900#) built on its patented SEP-iSYS™ technology. Each train handles 200 MMscfd using exotic materials for sour service, with cold insulation and fireproofing; key components include a 45 MT, 71 mm-thick vessel. NGLTech covered FEED, detailed design, procurement and construction (Phase 1) and pre-commissioning and commissioning support (Phase 2).
RESULTS & IMPACT
A three-train, 200 MMscfd-per-train inlet system engineered for 20 years of continuous offshore operation without dry docking, a flagship deployment of SEP-iSYS™ on a landmark FLNG.
TECHNOLOGIES &CAPABILITIES
SEP-iSYS™
EPC
Sour Service
900# System
Commissioning
Engineering & EPC
Tanjong Baram WHP Development
THE CHALLENGE
The Tanjong Baram field needed a low-cost, unmanned wellhead platform tied back to existing infrastructure, with minimal modifications to the host facility and allocation metering for production accounting.
THE NGLTECH SOLUTION
NGLTech developed and installed a conductor-supported, unmanned minimum-facilities WHP tied back via an 8.2 km flexible pipeline to WLDP-A, including minor WLDP-A modifications and allocation metering. The 236 MT topside was designed for 8,000 bpd (4,000 bpd throughput) and a 10-year design life. Scope spanned FEED, detailed engineering and procurement (Phase 1) plus PMT, pre-commissioning, hook-up and commissioning support (Phase 2).
RESULTS & IMPACT
A complete unmanned WHP delivered from design through commissioning, a compact, cost-efficient tie-back solution for a marginal Sarawak field.
TECHNOLOGIES &CAPABILITIES
Wellhead Platform
Minimum Facilities
Tie-back
Commissioning
Marginal Field
Engineering & EPC
Foroozan Field Development & Production Enhancement
THE CHALLENGE
The Foroozan field required a step-change in production capacity, integrated with existing infrastructure without disrupting ongoing operations, a classic brownfield production-enhancement challenge.
THE NGLTECH SOLUTION
NGLTech performed the detailed engineering design of a new process and utilities platform (FZ-A), bridge-linked to the existing FZ platform. The 6,069 MT topside was engineered for a 25-year design life.
RESULTS & IMPACT
Enhanced oil production from 44,000 to 98,000 bpd and gas throughput from 158 to 258 MMscfd, nearly doubling field output through a well-integrated new platform.
TECHNOLOGIES &CAPABILITIES
Detailed Engineering
Production Enhancement
Process Platform
Brownfield
Patented Technology
SEP-iSYS™ LPPU, Mature Field Production
THE CHALLENGE
As reservoirs mature, falling wellhead pressure strands recoverable hydrocarbons that conventional facilities can no longer process economically, leaving production and value in the ground.
THE NGLTECH SOLUTION
NGLTech deployed its patented SEP-iSYS™ Low Pressure Production Unit (LPPU), which lowers the operating pressure of the production system so that low-pressure wells can keep flowing and be processed. The technology was installed for PETRONAS at the West Lutong (2014) and Angsi (2016) fields.
RESULTS & IMPACT
Extended the productive life of mature fields by unlocking low-pressure production. The LPPU programme earned Focused Recognition from PETRONAS and an OTC Asia award for the wider MPU family.
TECHNOLOGIES &CAPABILITIES
SEP-iSYS™ LPPU
Production Enhancement
Mature Fields
Patented
Patented Technology
SEP-iSYS™ CSRS & GRS, Sand & Gas Recovery
THE CHALLENGE
Mature and high-rate fields produce sand and low-pressure associated gas that erode equipment, constrain throughput and are often flared or lost, hurting both integrity and recovery.
THE NGLTECH SOLUTION
NGLTech deployed its patented Compact Sand Removal System (CSRS) for cyclonic multiphase desanding and its Gas Recovery System (GRS) for bulk dewatering and gas recovery, including CSRS for the Bokor field (2017) and PETRONAS FLNG2 (2016), and GRS for West Lutong (2023).
RESULTS & IMPACT
Protected downstream equipment from sand erosion and recovered otherwise-lost low-pressure gas across multiple PETRONAS assets, improving both integrity and hydrocarbon recovery.
TECHNOLOGIES &CAPABILITIES
SEP-iSYS™ CSRS
GRS
Sand Removal
Gas Recovery
Patented
Patented Technology
SEP-iSYS™, Marginal & Stranded Field Processing
THE CHALLENGE
Marginal and stranded fields often cannot justify the cost and lead time of conventional facilities. Operators need compact, rapidly deployable processing to prove and produce them economically.
THE NGLTECH SOLUTION
NGLTech's patented SEP-iSYS™ platform provides slug handling and separation, extended well test (EWT) units, wellhead platform production units and crude stabilization units (CSU). Deployments include the TGT FPSO in Vietnam (2011), D1 FPSO in India (2011), Nautica Muar EWT (2012), and CSU units for MISC MaMPU1 (2016) and Ophir FPSO (2017).
RESULTS & IMPACT
Enabled economic production and early well testing across marginal and stranded fields in three countries, the core technology family behind much of NGLTech's international track record.
TECHNOLOGIES &CAPABILITIES
SEP-iSYS™
Slug Handling
EWT
Crude Stabilization
Marginal Field
Green & Decarbonization
Enhanced LP-CRS™, Condensate Recovery & Emission Reduction
THE CHALLENGE
Low-pressure gas streams rich in condensate are frequently flared or vented, wasting a valuable product and generating avoidable emissions, a growing commercial and regulatory liability for operators.
THE NGLTECH SOLUTION
NGLTech's patented Enhanced LP-CRS™ (Low Pressure Condensate Recovery System) uses deep chilling with self-regenerative MEG to recover natural gas liquids and condensate from low-pressure sources. It was deployed for MISC MaMPU1 (2014), Tamarind FPSO Intrepid in the Philippines (2018), PETRONAS Erb West (2018) and Vestigo Tembikai (2018).
RESULTS & IMPACT
Recovered saleable condensate while cutting flaring and emissions across multiple FPSOs and fields, a programme recognised with Focused Recognition from PETRONAS for the Erb West LP-CRS™ deployment.
TECHNOLOGIES &CAPABILITIES
LP-CRS™
Condensate Recovery
Emission Reduction
Self-Regenerative MEG
Patented
Green & Decarbonization
VOC-RS™, Volatile Organic Compound Recovery
THE CHALLENGE
Volatile organic compounds released from tanks and process vents represent both lost hydrocarbons and a significant source of emissions that operators are increasingly required to control.
THE NGLTECH SOLUTION
NGLTech's patented VOC-RS™ (Volatile Organic Compound Recovery System) captures and recovers VOCs from production facilities, converting a waste emission stream into recovered product.
RESULTS & IMPACT
Reduces facility emissions while recovering saleable hydrocarbons, a technology recognised with an OTC Asia award.
TECHNOLOGIES &CAPABILITIES
VOC-RS™
Emission Reduction
VOC Recovery
Patented
Green & Decarbonization
VERDYGEN™, TurboChill™ + AlgaeBloom™ CCUS
THE CHALLENGE
Hard-to-abate industries such as power generation, cement and steel emit CO₂ that is difficult and energy-intensive to capture, and most capture schemes create a new disposal problem rather than a useful product.
THE NGLTECH SOLUTION
NGLTech's VERDYGEN™ platform pairs TurboChill™ (flue-gas conditioning and pressure boosting) with AlgaeBloom™ (a bicarbonate-based continuous carbon capture and utilization system). The process conditions raw flue gas (0.2 barg at 150°C) and uses it to cultivate microalgae, recycling flue-gas energy for both capture and algae drying. TurboChill™ is patented and operational at multiple offshore sites (TRL 9); AlgaeBloom™ is patent-pending on lab-scale pilot success (TRL 7).
RESULTS & IMPACT
Captures 70 to 90% of CO₂ from hard-to-abate flue gas at low energy cost. 1.8 t CO₂ captured yields 1 t of cultivated microalgae, with roughly 6x more biomass than conventional cultivation and significantly less waste. Recognised with an OTC Asia award.
TECHNOLOGIES &CAPABILITIES
TurboChill™
AlgaeBloom™
CCUS
Carbon Utilization
Microalgae
Green & Decarbonization
IsobaricGT™, High-Speed Gas Transfer
THE CHALLENGE
Conventional CNG loading and transfer is slow, energy-hungry and subject to thermal and pressure swings, limiting the economics of monetizing stranded and associated gas.
THE NGLTECH SOLUTION
NGLTech's IsobaricGT™ delivers complete, high-speed gas transfer with minimal power consumption and no thermal or pressure fluctuations, enabling safe and efficient CNG handling. A pilot plant operates at NGLTech's R&D Centre in Kuchai Lama, and NGLTech Sarawak and SEDC Energy have formalized a joint intent to pioneer IsobaricGT™ deployment in Sarawak.
RESULTS & IMPACT
A safer, faster, lower-energy gas transfer route for stranded and associated gas, now advancing toward field deployment through the SEDC Energy partnership.
TECHNOLOGIES &CAPABILITIES
IsobaricGT™
CNG Transfer
Stranded Gas
Patented
Trusted by leading operators & contractors
Since inception, NGLTech has delivered engineering and technology solutions for a wide selection of clients, locally and abroad.